Perfectly appointed

As Opus rises, each stage of construction marks
a considered step in its creation. Crafted with precision, the building’s form is now emerging, revealing the vision behind this riverside masterpiece.

FEBRUARY 2026

Chinese New Year at Opus

Celebrating the year of the Horse, Native Land and 11K hosted an immersive cultural experience which featured a traditional lion dance performance, live Chinese music and the creation of bespoke calligraphy bookmarks inscribed with New Year wishes.

SEPTEMBER 2025

Opus Tops Out

Opus has topped out and now stands at 50-storeys, 170 metres, high above London’s South Bank. To mark this major milestone within the Bankside Yards development, Native Land and principal contractor Mulitplex welcomed the entire project team, partners, investors and contractors to the 41st floor of Opus, for a topping out ceremony held against the backdrop of exceptional panoramic views of London’s skyline and the River Thames.

APRIL 2025

Opus Sales Gallery opens

Set within the restored Victorian railway arches at Bankside Yards, the Opus Sales Gallery offers an immersive introduction to the architectural ambition, refined lifestyle, and cultural context of Opus. Now open by appointment, the gallery features a cinematic immersion room, detailed scale models, and a beautifully crafted show apartment - every element of the gallery brings the vision of Opus to life.

APRIL 2025

Opus launch event

Truly a night to remember, Opus has officially launched. Set within the fully restored historic arches of Bankside Yards, the immersive evening unfolded as a multi-sensory celebration. A bold expression of the Opus vision, the event featured electrifying dance performances, DJ sets by Mary Charteris and Hanna Hanra, and seasonal gastronomy paired with bespoke cocktails curated by Bistrotheque.